Portfolio · Selected Projects

Recent work.
London & the
South East.

A small selection of recent ProCraft refurbishments. The full archive — including in-progress projects — is shared on Instagram. The work below is what we are most proud of, and most willing to be judged on.

Across services.
Across postcodes.

Kitchen · Chelsea

Green Kitchen Transformation

Bathroom · Kensington

Pink Bathroom Suite

Flooring · Ascot

Herringbone Floor

Bathroom · London

Master Bathroom Suite

Green Kitchen
Transformation, Chelsea.

A complete bespoke kitchen refurbishment for a Chelsea townhouse. Hand-built cabinetry in deep green with brushed brass hardware, marble worktops with waterfall edge, and a fully integrated appliance suite.

The brief: a kitchen that worked as the social heart of the house and stood up to daily family use without apology. The challenge: working around the period detailing of the existing space and matching the cornicing back precisely.

Build time: 8 weeks. Delivered on schedule, on budget, and to a finish that has prompted three referrals from neighbours since handover.

Bespoke Kitchens Service

Pink Bathroom Suite,
Kensington.

A luxury en-suite bathroom in a Kensington apartment. Walls in soft blush microcement, herringbone marble flooring, brushed gold brassware throughout, and a bespoke vanity built in solid oak with a single piece of stone.

The brief was for a bathroom that felt like a hotel suite without losing the warmth of a private home. The work involved relocating the soil stack — coordinated with the freeholder and the building's managing agent — and a full re-board for acoustic compliance.

Build time: 5 weeks. Photographed for the studio's Instagram feed where it remains one of the most-shared projects to date.

Luxury Bathrooms Service

Herringbone Floor,
Ascot.

A full ground-floor flooring installation in a substantial Ascot property. Wide-plank European oak laid in a traditional herringbone pattern across reception rooms, hallway and orangery — approximately 180 square metres.

The work involved comprehensive sub-floor preparation, acclimatisation of the timber over two weeks, and installation around three sets of bi-fold doors and a feature staircase. Hand-finished and oiled on site for a soft, lived-in matte finish.

Build time: 3 weeks excluding acclimatisation. The flooring transformed the entire ground floor of the property and was specified to last a generation.

Premium Flooring Service

In-progress & recently completed.

Our Instagram feed carries the day-to-day — works in progress, finished details, before-and-afters and behind-the-scenes shots that do not always make it to the website. It is the most current view of what we are working on.

@procraft_refurb on Instagram
Your Project

Want this standard of finish?

Igor will arrange a free consultation at your property within 48 hours. No obligation — just an honest conversation about what is possible in your space.

Request a Free Consultation Message on WhatsApp